• Follow us
  • Facebook
  • Twitter
  • Linkedin
  • YouTube
  • RSS
  • Contact us

Getting access to our website

Read more

Search form
Casco Bay Lines newbuild © Elliott Bay Design Group

Casco Bay Lines newbuild © Elliott Bay Design Group

Elliott Bay Design Group - designed hybrid-electric ferry enters construction

Elliott Bay Design Group (EBDG) announces their design of a hybrid-electric passenger vehicle ferry for Casco Bay Lines of Portland, Maine will enter the construction phase at Senesco Marine of North Kingstown, Rhode Island. The 164-foot ferry will
replace an existing diesel-powered ferry, the MACHIGONNE II, resulting in a reduction of 800 tons of carbon dioxide each year, helping to improve air quality in and around Portland, Maine.

EBDG has supported Casco Bay Lines and their steering committee since 2018 as they prepared and planned for this replacement ferry, operating between Portland and Peaks Island, Maine. The contract design meets operational requirements, increased passenger demand and Casco Bay Lines' goal of reducing their carbon footprint. As part of the preliminary design efforts, EBDG prepared a propulsion selection study to compare various propulsion systems based on capital cost, operating cost, reliability, serviceability, CO2 emissions, and in port noise and exhaust generation.

The result is a ferry that features ABB Marine & Ports' hybrid propulsion system supporting diesel-electric and zero-emissions battery-powered modes, as well as a combination of both. With the ferry operating in zeroemission mode, the passengers will benefit from a smoother, quieter and cleaner ride. A Stemmann Technik FerryCHARGER shore charging system is also provided by ABB for rapid vessel charging in Portland.

The hybrid-electric ferry has capacity for 15 vehicles and 599 passengers, spread across three decks including a sun deck with unobstructed views. The double-ended configuration eliminates the need to turn the vessel around and thus reduces the required speed and energy consumption for the new vessel even though it is larger than the MACHIGONNE II.

EBDG will provide technical support services to Casco Bay Lines as the ferry progresses through construction. The ferry is expected to enter operating service in 2024.

Jul 25 2022


Get the latest news - for FREE

Receive our weekly newsletter with the latest news and unique special offers.

Products

Shippax Info

Our monthly magazine + Online Access.1 year subscription.

More

Shippax Designs 24

VARSOVIA

More

Shippax Market 24

Market reports & outlook

More

Shippax Guide 24

GREEN TECHNOLOGIES

More

Shippax Database - Single user

Shippax Database online

More

Ferry Statistics

Price upon request

More

Don’t miss out!

The place to meet the ferry shipping industry!